master bedroom
12/30/2007
|

| |
12/30/2007
|

| |
master bath - almost done
12/30/2007
|

| |
12/30/2007
|

| |
guest bath
12/30/2007
|

| |
master bedroom
12/30/2007
|

| |
12/30/2007
|

| |
12/30/2007
|

| |
12/30/2007
|

| |
12/30/2007
|

| |
living room - finished!
12/30/2007
|

| |
view from the old to the new.
12/30/2007
|

| |
guest bedroom
12/30/2007
|

| |
12/30/2007
|

| |
12/30/2007
|

| |
11/13/2007
|

| |
laundry room close to done.
11/13/2007
|

| |
Joe works with concrete on the fireplace.
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
new patio with future fire pit gas line stubbed in
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
new stairs through the 2 basements.
11/13/2007
|

| |
11/13/2007
|

| |
11/13/2007
|

| |
front porch gets torn off.
11/13/2007
|

| |
11/13/2007
|

| |
siding is almost finished.
09/29/2007
|

| |
09/29/2007
|

| |
09/29/2007
|

| |
09/29/2007
|

| |
almost there. New door and porch next.
09/29/2007
|

| |
Painters, Mark and Craig get started.
09/29/2007
|

| |
stay tuned for the end result.
09/29/2007
|

| |
before
09/19/2007
|

| |
09/19/2007
|

| |
where's Joe's mask?
09/19/2007
|

| |
windows are mostly in.
09/19/2007
|

| |
09/19/2007
|

| |
siding is coming along.
09/19/2007
|

| |
09/19/2007
|

| |
09/19/2007
|

| |
09/19/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
new windows replace the old.
08/30/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
starting from scratch!
08/30/2007
|

| |
working on the garage.
08/30/2007
|

| |
removing stucco was a major chore.
08/30/2007
|

| |
future 200 sq. foot monster closet.
08/30/2007
|

| |
08/30/2007
|

| |
08/30/2007
|

| |
the attic is all exposed.
08/29/2007
|

| |
08/29/2007
|

| |
almost all framed!
07/27/2007
|

| |
Dave builds the stairs
07/26/2007
|

| |
making room for a bathroom
07/26/2007
|

| |
the beam arrives
07/26/2007
|

| |
master bedroom takes shape
07/26/2007
|

| |
starting fresh
07/25/2007
|

| |
first walls are up
07/25/2007
|

| |
wall is cut away for the entrance to the old bsmt.
06/28/2007
|

| |
Dave the contractor framing the floor.
06/28/2007
|

| |
my good friend Joe Bates working on our house.
06/28/2007
|

| |
view of the basement bathroom and bedroom.
06/28/2007
|

| |
kids loved the dirt pile.
06/10/2007
|

| |
basement walls go up.
06/10/2007
|

| |
Eco-Block is used for the foundation. Super insul
06/10/2007
|

| |
Jeff Crouch, our architect working out some detail
06/10/2007
|

| |
the floor is insulated and ready for concrete.
06/10/2007
|

| |
big mess in the backyard!
06/09/2007
|

| |
06/09/2007
|

| |
It took me all day to dig that hole!
06/09/2007
|

| |
digging the new sewer.
06/08/2007
|

| |
Here's the view of our home after we got back from
06/01/2007
|

| |